Excavation of 3500㎥ of rock on a slope of 33degrees whilst keeping the quarry below operational throughout
Installation of 5 No. inclinometers along an existing embankment at Brandon Cutting with recovery of class 1 core samples during traffic hours
Excavation and reprofiling of existing embankment during traffic hours with no impact to the operational railway